Design and Construction Supervisor South Cotabato II Electric Cooperative, Inc. (SOCOTECO II)
Led a team of six personnel, including design engineers, close-out officers, a right-of-way officer, and a draftsman, while directing more than 13 line-construction contractors. Delivered over 100 distribution line projects annually, including 144 projects and 86.5 circuit kilometers of new lines in 2025.
Supervised a 25 km, 69 kV sub-transmission line from design through completion, valued at approximately EUR 1.5 million. Inspected sites for compliance with technical specifications, safety rules, and schedules, and accepted completed work.
Reviewed and approved more than 500 staking plans, bills of materials, and work orders. Verified contractor billing and managed project close-out activities, including as-built documentation, material reconciliation, and final billing. Prepared the technical report for uprating a substation from 10 MVA to 20 MVA.