Operations Manager Grupo Albanesi S.A.
Participated in the revamping of the 160 MW Sorrento Thermal Power Plant and the commissioning of the 135 MW Arroyo Seco Cogeneration Thermal Power Plant. Contributed across engineering, commissioning, testing, start-up, and commercial operation phases to ensure safe, reliable, and efficient plant operation.
Led multidisciplinary teams of up to 24 employees in 24/7 operational environments. Coordinated operating schedules, fuel supply, demineralized and cooling water provision, and communication with CAMMESA, EPESF, industrial clients, and corporate areas.
Developed operational procedures, work instructions, fault analyses, and management reports. Participated in IRAM internal and external audits, maintaining compliance with ISO 9001, ISO 14001, and ISO 45001 standards without critical findings or nonconformities.
Managed seasonal maintenance plans and CAMMESA submissions. Supervised a 15 km gas pipeline and internal natural gas installation under NAG100 requirements, as well as the migration from analog controls to Siemens DCS/SCADA digital platforms and related SOTR, SMEC, network, and CCTV systems.